Board Orders and Agreements

These are orders issued by the Louisville Metro Air Pollution Control Board (Board) under the authority of KRS 77. The documents are in Adobe portable document format (PDF).  If you have trouble opening a file by clicking the link, try this: download the file (on most web browsers, right-click and choose "Save Target As" or "Save Link As"), then open the downloaded file from Adobe Reader or another PDF reader.  More for information about a Board order, you can e-mail us.


Enforcement Agreed Board Orders

These are Air Pollution Control Board agreed orders, usually issued as a result of a violation of one or more regulations, requiring the responsible party to take specific actions.

2014

Date Number and Link, Affected Party / Subject
9/17/2014 ABO 14-02 with The Hertz Investment Group, Inc.
2/19/2014 ABO 14-01 with BAE Systems Land and Armaments, L.P. / compliance with emissions standards, permit requirements

2013

Date Number and Link, Affected Party / Subject
11/20/2013 ABO 13-07 with Louisville Gas and Electric Company / fugitive emission; Odor and fugitive dust control plan referenced in the order
10/16/2013 ABO 13-06 with Rohm and Haas Chemicals LLC / excess emissions during startups, shutdowns and upset conditions, permit conditions
8/21/2013 ABO 13-05 with Advance Ready-Mix, Inc. / fugitive particulate emissions,  excess emissions during startups, shutdowns and upset conditions, permit conditions
7/17/2013 ABO 13-04 with Kosair Charities Committee, Inc. / asbestos
6/19/2013 ABO 13-03 with Eckart America Corporation / permit requirements
4/17/2013 ABO 13-02 with Louisville Gas & Electric Company / objectionable odors and fugitive particulate emissions
2/20/2013 ABO 13-01 with Momentive Specialty Chemicals, Inc. / excess emissions during startups, shutdowns and upset conditions, permit conditions

2012

Date Number and Link, Affected Party / Subject
6/20/2012 ABO 12-03 with Nuplex Resins, LLC / odor
6/20/2012 ABO 12-02 with E. I. Du Pont de Nemours / excess emissions during startups, shutdowns and upset conditions, toxic air pollutants
4/18/2012 ABO 12-01 with Louisville Gas & Electric Company / fugitive particulate matter and excess emissions during startups, shutdowns and upset conditions

2011

Date Number and Link, Affected Party / Subject
10/19/2011 ABO 11-11, Eckart America Corporation / permit compliance
9/21/2011 ABO 11-10, E.I. duPont de Nemours & Company / permit compliance
8/17/2011 ABO 11-09, Lubrizol Advanced Materials, Inc. / permit compliance
7/20/2011 ABO 11-08, Louisville Medical Center, Inc. / permit compliance
7/20/2011 ABO 11-07, Candela Systems Corporation / asbestos
6/15/2011 ABO 11-06, Nuplex Resins LLC / odor; excess emissions during startups, shutdowns and upset conditions
6/15/2011 ABO 11-05, Gaylor, Inc. / asbestos
3/16/2011 ABO 11-04, Swift & Company / permit conditions; odor
2/16/2011 ABO 11-03, American Synthetic Rubber Company / permit conditions
2/16/2011 ABO 11-01, University of Louisville / asbestos
1/19/2011 ABO 11-02, Rohm and Haas Company / excess emissions

2010

Date Number and Link, Affected Party / Subject
12/15/2010 ABO 10-04, Kosmos Cement Company / control of fugitive emissions
11/17/2010 ABO 10-03, Eckart America Corporation / operating equipment without emissions control
4/21/2010 ABO 10-02, American Synthetic Rubber Company / multiple issues
1/20/2010 ABO 10-01, U.S. Combat Systems, a Division of BAE Systems Land and Armaments, L.P. / multiple issues

2009

Date Number and Link, Affected Party / Subject
9/16/2009 ABO 09-04, Ralph Avenue Recycling Center LLC / odor control and fugitive emissions control
6/17/2009 ABO 09-03, American Synthetic Rubber Company / permit requirements
4/15/2009 ABO 09-02, Rohm & Haas Company / excess emissions during upset conditions
3/20/2009 ABO 09-01, Kelley Technical Coatings / permit requirements

2008

Date Number and Link, Affected Party / Subject
11/19/2008 ABO 08-03, Swift Pork Company / odor, particulate matter
6/18/2008 ABO 08-02, Bulk Petroleum Corp. / gasoline vapor recovery and control
2/20/2008 ABO 08-01, Clark Management Co., Inc. et al. / asbestos

2007

Date Number and Link, Affected Party / Subject
12/19/2007 ABO 07-06, Courier Journal and Louisville Times, Inc. / VOC
9/19/2007 ABO 07-05, Louisville Medical Center / NOx
8/15/2007 ABO 07-04, Dixie Demolition, Inc. / asbestos
8/15/2007 ABO 07-03, Lubrizol Advanced Materials, Inc. (formerly Noveon, Inc.) / Vinyl Chloride/Volatile Organic Compounds (VOC)/Particulate Matter/Opacity
3/21/2007 ABO 07-02, Tetra Tech, Inc. / asbestos
3/21/2007 ABO 07-01, Central Station, LLC / asbestos

2006

Date Number and Link, Affected Party / Subject
12/13/2006 05-LMAPD-0485, Elder Contruction, and Yana Elder Co. / asbestos: Recommended order by State hearing officer
10/18/2006 ABO 2006-06, Ralcorp Frozen Bakery Products, Inc. d.b.a. Bakery Chef, Inc. / violations of Regulation 1.09 
10/18/2006 ABO 06-05, Metropolitan Sewer District / Morris Forman WTP - permit requirements
6/21/2006 ABO 06-04, Masonic Homes, Inc. / asbestos
5/17/2006 ABO 06-03, Kosmos Cement Co. / fugitive particulate emissions
3/15/2006 ABO 06-02, Marathon Petroleum Company LLC / VOC, particulates, HAPs
2/15/2006 ABO 06-01, Carbide Industries, LLC / Volatile Organic Compounds (VOC)

2005

2004

2003

2002

2001


Enforceable Board Agreements

These are Air Pollution Control Board agreed orders in which the other party has agreed to take specific measures to reduce specified air pollution emissions.

2013

Date Affected Party / Subject
6/19/2013 Reynolds Consumer Products Inc., Amendment 1 / VOC

2012

Date Affected Party / Subject
9/19/2012 Reynolds Consumer Products, Inc. / VOC

2010

Date Affected Party / Subject
6/16/2010 University of Louisville Belknap Campus / particulate matter

2004

Date Affected Party / Subject
5/17/2004 American Synthetic Rubber Company / 1,3-Butadiene
5/17/2004 DuPont Dow Elastomers LLC / Chloroprene
5/17/2004 Zeon Chemicals, LP / 1,3-Butadiene
5/5/2004 Rohm and Haas Kentucky, Inc. / 1,3-Butadiene: Rohm and Haas and APCD have agreed that an enhanced leak detection and repair (LDAR) program will be incorporated into the facility's Title V operating permit.

SIP Orders

These are Air Pollution Control Board orders that have been adopted as part of the State Implementation Plan.  They remain in effect until superseded.  They are listed here in reverse chronological order (latest first).

Date

Plant / Subject

8/21/2013 Louisville Medical Center Steam Plant / NOx RACT, Amendment 3
6/17/2009 Texas Gas Transmission / NOx RACT-Amendment 2
3/19/2008 Lou. Medical Center Steam Plant / NOx RACT, Amendment 2
5/19/2004 Kosmos Cement / NOx RACT-Amendment 2 
2/21/2001 Lou. Medical Center Steam Plant / NOx RACT, Amendment 1
2/21/2001 Ford Lou. Assembly Plant / NOx RACT, Amendment 1
1/17/2001 GE Appliances / NOx RACT, Amendment 1
12/20/2000 American Synthetic Rubber / NOx RACT
12/20/2000 OxyVinyls / NOx RACT, Amendment 1
12/20/2000 Texas Gas Transmission / NOx RACT, Amendment 1
10/18/2000 Kosmos Cement / NOx RACT, Amendment 1
10/18/2000 LG&E Cane Run Station / NOx RACT, Amendment 1
10/18/2000 LG&E Mill Creek Station / NOx RACT, Amendment 1
11/8/1999 E. I. duPont Fluoroproducts / NOx RACT
11/8/1999 Rohm & Haas Kentucky / NOx RACT