Engineering Objectives |
Description (associated strategies) |
Timeline |
Audience |
|
|
|
|
| Complete the Louisville Loop |
Create a list of projects with a defensible, data-driven prioritization process that incorporates current and future demand, socio-economic measures, and land use in order to make the most of limited funds and to ensure that improvements best meet needs. |
2030 |
General Public |
|
|
|
|
| Implement higher cost / high priority improvements using the prioritization criteria set forth in the Bike Master Plan |
Refer to table 1 in Bike Master Plan for list of high priority improvements and associated costs |
2030 |
General Public |
|
|
|
|
|
Implement Lower cost / high priority improvements in the urban center using the prioritization criteria set forth in the Bike Master Plan |
Bike Lanes:
8th St From: Market To: Broadway
|
Fall 2010 Completed |
General Public
|
| Improve the bicycle wayfinding sign network |
Fall 2011 |
General Public
|
|
8th St From: Market To: Broadway |
Fall 2010 Completed |
General Public
|
|
Stonestreet From: Dixie To: Old 3rd Street |
Fall 2010 Completed |
General Public
|
|
Taylorsville Road From: McMahan To: Hurstbourne |
Fall 2010 Completed |
General Public
|
|
Poplar Level From: 264 To: Eastern Pkwy |
Fall 2010 Completed |
General Public
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Continue to integrate bicycle and pedestrian facilities into the transportation network |
Maintain and improve bike route signage, mapping and wayfinding:
1. Integrate mapping and sign system 2. Create an interactive map allowing cyclists to indentify routes based on their ability
Maintenance program for Louisville Metro Bike & Pedestrian facilities:
1. Develop a plan 2. Insure bike facilities are clear of debris
Expand bicycle system network 1. Complete streets 2. Restripe streets with bike lanes during standard resurfacing 3. Increase bike parking 4. To improve Louisvilleās off-road facilities: Evaluate user demand, Identify areas to improve, and Prioritize facility improvements
See our Current Projects Page for the latest information on specific projects. |
Ongoing
Ongoing
Ongoing
2-2030
Ongoing
|
General Public
General Public
General Public
General Public
|
|
|
|
|
| Establish criteria and set priorities for constructing bicycle facilities off road based upon condition, location and proximity, as well as current and future demand |
Create a single system to inventory, assess and track bike trails and other off road bicycle facilities. |
2010 Completed |
General Public
|
|
Mountain Bike Master Plan |
2010 |
General Public
|
|
2012 Cyclocross Wolds Course |
Fall 2010 Completed |
General Public
|
|
Ensure bicyclist of all ages and skill levels feel comfortable and safe riding to their destinations |
Develop a street design standards manual that incorporates all modes of transportation into street design standards for Louisville
Identify & prioritize intersection improvements for cyclists:
- Evaluate the safety of existing routes
- Complete Streets Implementation
|
Ongoing
Ongoing
|
General Public
General Public
|