Bid Results

Louisville Water Company provides a 6-month bid history online. You can also visit the ePlanroom for current bid opportunities. If you need more information, contact Procurement Services.

Bids Under Review: ***The presence of bid tabulations is not an express or implied representation by the Louisville Water Company, and must not be interpreted as a guarantee, endorsement, or warranty of contract award and may not result in contract award. Bids with status currently "Under Review" require approval(s) before final contact award is authorized.***

Open Date Bid No. Bid Title Buyer Status
8/27/2014 14-133 Tank Coating Program - Blankenbaker Crossings and Jefferson Memorial Tanks Terri Conner Under Review
8/27/2014     14-134 B.E. Payne Water Treatment Plant Mixer Renovation Robin Heitz     Under Review
8/20/2014 14-142 Cisco Maintenance Contract Renewals     Terri Conner Under Review
8/20/2014 14-137 Steel Casing Pipe David Collier Under Review
8/20/2014 14-100 Pipe Repair Couplings David Collier Under Review
8/13/2014 14-98 Casing Spacers David Collier Under Review
8/13/2014 14-99 Rebar Anchors David Collier Under Review
8/13/2014 14-129 Propylene Glycol David Collier Under Review
8/13/2014 14-128 Allmond Distribution Center Garage Overhead Crane Replacement Robin Heitz Under Review
8/13/2014     14-131     Crescent Hill Pump Station slate Roof ReEplacement and Masonry Improvements     Renee Fromme     Under Review
8/6/2014     14-117 Water Treatment Chemicals     Renee Fromme Under Review
8/6/2014 14-97 Pipe Repair Sleeves David Collier Under Review
8/6/2014 14-96 Meter Setters David Collier Under Review
8/6/2014 14-102 Polywrap David Collier Under Review
8/6/2014 14-126 Salt River Booster Pumping Station - 690 Plan     Robin Heitz Under Review
7/30/2014 14-87 Watterson Expressway Area Lead Service Renewals Terri Conner Reject all Bids
7/30/2014 14-127 Louisville Water Company Pumping Station #1 Interior Restoration Tax Credit     Terri Conner Awarded
7/23/2014     14-121 Dreams End Drive Main Extension Robin Heitz Reject All Bids
7/23/2014 14-124 Hydraulic, Machine and Gear Oils Terri Conner     Awarded
7/16/2014     14-119              New Services Renee Fromme Awarded
7/9/2014 14-118 Reutlinger Avenue Area Lead Service Renewals Terri Conner     Awarded
7/9/2014 14-114 Bullitt County Extension Program (BCEP) Worldview Circle Area Main Extension Renee Fromme  Awarded
7/9/2014     14-111 Filter Drain Valve Replacement @ BEPWTP - Phase 3     Robin Heitz Awarded
6/25/2014     14-113 Edgeland Avenue Area Lead Service Renewals Renee Fromme        Awarded
6/25/2014 14-86 Central Area - Northeast Area Lead Service Renewals     Terri Conner Under Review
6/25/2014         14-112 Rosewood Avenue Area Lead Service Renewals     Robin Heitz Awarded
6/18/2014     14-90 Grinstead Drive Area Water Main Replacement Project Robin Heitz Under Review
6/4/2014 14-85 Wirth Avenue Area Lead Service Renewals Terri Conner Awarded
5/28/2014 14-34 B.E. Payne WTP & Crescent Hill WTP Liquid Ammonia Feed System Renee Fromme Under Review
5/28/2014  14-02 Customer Identification Verification Services     Robin Heitz Under Review
5/21/2014 14-79 Berry Boulevard Area Lead Service Renewals Project         Robin Heitz Awarded
5/21/2014     14-01     Crescent Hill Filter Plant / 480 Volt Distribution system Rehabilitation     Renee Fromme     Awarded
5/14/2014     14-82 Vehicle Wash Supplies     Robin Heitz Awarded
5/14/2014 14-75 Cisco UCS Blade Servers     Robin Heitz Awarded
5/7/2014     14-77 10th Street Area MRRP     Renee Fromme Awarded
5/7/2014 14-31 Swing Check Valves David Collier Under Review
4/30/2014     14-47     B.E. Payne Process Water and Storm Water Drainage Control and Sanitary Sewers     Renee Fromme Under Review
4/30/2014 14-60 22nd Street Area Water Main Replacement Project     Terri Conner Awarded
4/30/2014 14-44 Plumbing Services Robin Heitz Awarded
4/16/2014 14-46 Brooks Hill Booster Pump Station     Renee Fromme Awarded
4/16/2014     14-56 Crew Truck Underdeck Air Compressor/AC Generator Renee Fromme Awarded
4/16/2014 14-54 Crescent Hill Treatment Plant - Security Building and Grinstead Entrance Improvements Robin Heitz Awarded
4/2/2014 14-30 AVT Insertion Valves David Collier Under Review
4/2/2014 14-28 Valve Boxes David Collier Under Review
4/2/2014 14-25 Distribution System Repairs and Capital Improvements     Terri Conner Awarded
4/2/2014   14-41 770 Plan - Springdale Road PRV Station Terri Conner Awarded
3/26/2014 14-43 Water Bottles, 14 oz. and 22 oz. Robin Heitz Awarded
3/26/2014         14-45 REHAB - 24-Inch PCCP Cross County Header     Robin Heitz Awarded
3/12/2014  14-42 Copper Tubing David Collier Under Review
3/5/2014 14-23 PVC Pipe David Collier Under Review
3/5/2014 14-26 Ductile Iron Pipe David Collier Under Review
3/5/2014 14-24 Temporary Booster Pumps     Terri Conner No Bids
3/5/2014 14-18 Long Run Tank Demolition Terri Conner Awarded
02/12/2014     14-19     Long Run Tank Power and Telemetry Panel Relocation Renee Fromme Awarded    
02/12/2014     13-197 Colliers Way & Mt. Elmira Rd. Grid Tie & PRV Robin Heitz     Awarded
02/05/2014     14-08 Major Engine Transmission Repairs - One Ton and Over Robin Heitz     Under Review
02/05/2014     14-07 Major Engine Transmission Repairs - Under One Ton Robin Heitz     Awarded
01/08/2014 13-151 Sale of LWC Surplus Property Carol Lyons Under Review
12/18/2013     13-101 Print Utility & Mail Services     Renee Fromme Final-Corrected
12/11/2013 13-115 Restraint Joint Adapters David Collier Under Review
12/11/2013 13-116 Gate Wheel Valves David Collier Under Review
12/11/2013 13-117 Ductile Iron Pipe Restraint Joint Pipe David Collier Under Review
12/11/2013 13-118 PVC Pipe David Collier Under Review
12/11/2013 13-181 Ball Park Tank Demolition Terri Conner Awarded
12/4/2013 13-114 Stone, Soil, Mfg Sand & Coarse Concrete Sand David Collier Under Review
12/4/2013 13-113 Ready Mix Concrete and Flowable Fill David Collier Under Review
11/27/2013 13-148 Equipment Rental - Louisville Water Tower Renee Fromme Under Review
11/20/2013     13-180    Communication System Maintenance     Renee Fromme Awarded
11/6/2013 13-175 Steel Casing Pipe David Collier Under Review
11/6/2013     13-119 Polywrap David Collier Under Review
10/23/2013 13-155 Analytical Services For Drinking Water Terri Conner Awarded
10/23/2013 13-170 Bullitt County Extension Program - Nichols Hill Road Booster Pumping Station Terri Conner Awarded
10/16/2013     13-165     Ball Park Tank Demolition     Robin Heitz Reject All Bids
10/16/2013 13-168 PVC Pipe     David Collier    Under Review
10/16/2013     13-150 REHAB - 60-inc RCP-Bluegrass, Hazelwood, and Manslick Renee Fromme     Under Review
10/9/2013 13-145 HVAC Maintenance Renee Fromme     Awarded
10/9/2013     13-162     48" Bell Joint Clamps David Colier Under Review
10/9/2013     13-163 Fifteen (15) Ton Trailer Robin Heitz Awarded
10/2/2013 13-164 Utility Service Body for 1 Ton Cab & Chassis     Terri Conner Awarded
10/2/2013 13-160 Ten (10) Yard Dump Body     Robin Heitz Awarded
9/25/2013     13-149 Water Treatment Chemicals for Fort Knox Facility Renee Fromme Under Review
9/25/2013 13-156 Contingency Contract for Motor Repairs     Robin Heitz Awarded
9/25/2013         13-154 Vehicle Body and Suspension Repairs - Heavy Duty Robin Heitz Awarded
9/25/2013 13-153 Vehicle Body and Suspension Repairs - Light Duty     Robin Heitz Awarded
9/25/2013     13-143 Road and Tire Service Robin Heitz Awarded
9/18/2013 13-142 Filter Drain Valve Replacement at B.E. Payne Water Treatment Plant Phase 2     Terri Conner Awarded
9/4/2013 13-138 Networking Upgrades and Replacements     Robin Heitz Awarded
9/4/2013     13-141 Crescent Hill Water Treatment Plant Frankfort Avenue Wall Restoration Renee Fromme     Awarded
8/28/2013     13-89 Freys Hill Booster Pumping Station Renovation Renee Fromme     Awarded
8/14/2013     13-107 Crescent Hill Filter Plant Control Room Modifications     Robin Heitz Awarded
8/14/2013 13-135 Ductile Iron Pipe Restraint Joint Pipe David Collier Under Review
8/14/2013 13-134 Bullitt County Water Improvement Program Walls Hollow Road North Grid Tie Terri Conner Awarded
8/7/2013 13-112 Brass Valves and Fittings David Collier Under Review
8/7/2013 13-94 Hydraulic, Machine and Gear Oils Terri Conner Awarded
7/24/2013 13-03 Employee Assistance Program Services Carol Lyons Awarded    
7/24/2013     13-106 Water Treatment Chemicals Carol Lyons Awarded    
7/17/2013     13-104 Crescent Hill Gate House and Gatekeepers House Improvements Carol Lyons Awarded
7/17/2013 13-99 Tank Coating Program 2013-Blankenbaker Crossings and Jefferson Memorial Tanks Terri Conner Reject All Bids
7/10/2013 13-98 Bullitt County Extension Program North and South Summitt Drive Booster Pumping Station     Terri Conner Awarded
7/10/2013     13-95 770 PZ Bayberry PRV Station Rebuild Robin Heitz     Awarded
7/3/2013 13-100 Bullitt County Water Improvement Program Horse Run Court and Hill Creek Road Grid-Tie Terri Conner Awarded
6/26/2013 13-93 Gap-in-Knob Standpipe Demolition Terri Conner   Reject All Bids
6/19/2013 13-92 Chilicoop Standpipe Demolition Robin Heitz Awarded
6/19/2013     13-87 I-65 Area Water Main Replacement Project Robin Heitz Awarded
6/12/2013 13-90 Lime Kiln Lane Water Main Replacement Project Robin Heitz Awarded
6/12/2013 13-91 Bullitt County Water Improvement Program Two-Thirds Majority Petition:  Nichols Hill Road & Ables Mountain Lane     Robin Heitz  Awarded
6/5/2013 13-88 Lexington Road Area Lead Service Renewal Terri Conner Awarded
6/5/2013 13-86 Adams Hill Townhomes Water Main Replacement     Robin Heitz Reject All Bids
6/5/2013 13-82 NACE 3 Consultants Terri Conner Awarded
6/5/2013 13-81 2013 Cathodic Protection Installation Project Terri Conner Awarded
6/5/2013 13-45 Janitorial Services Carol Lyons Awarded
6/5/2013 13-24 B.E. Payne WTP Sodium Hypochlorite Generation Facilities Carol Lyons Awarded
5/29/2013 13-85 Heavy Equipment Rental Carol Lyons Awarded
5/22/2013     13-58 Copper Tubing David Collier Under Review
5/15/2013 13-78 Bullitt County Water Improvement Program 2/3's Majority Petition North and South Summit Drive 4-Inch Water Main Extension     Terri Conner Awarded
5/15/2013 13-74 Navteq Data Terri Conner Awarded
5/15/2013 13-70 Lower Hunters Trace Water Main Replacement Project Terri Conner   Awarded
5/8/2013 13-75 Cisco UCS Server             Robin Heitz
Awarded
5/8/2013         13-72 Sherwood Avenue Area Lead Service Renewals Robin Heitz Under Review
5/1/2013 13-64 Sodium Permanganate Feed System and Lime Dust Collection System at CHWTP Carol Lyons Awarded
5/1/2013 13-17 Plastic Meter Vaults and Elevator Rings David Collier Under Review
5/1/2013 13-68 Water Pressure Regulators David Collier Under Review
5/1/2013 13-57 44th Street Area Water Main Replacement Project Terri Conner   Awarded
4/24/2013 13-66 Inspection, Maintenance & Repair of Elevators at Louisville Water Company Terri Conner Awarded
4/24/2013 13-63 Oracle Workspace Optimization - John L. Huber Building Terri Conner Awarded
4/24/2013 13-61 Small Hand Tools     David Collier Awarded
4/10/2013 13-18 Ductile Iron Fitting and Accessories    David Collier Awarded
4/10/2013            13-23 Breckenridge Lane Water Main Grid-Tie Project     Robin Heitz Awarded
4/10/2013 13-19 Aluminum Hatches David Collier Awarded
4/3/2013     13-15 Transmission System Repairs and/or Capital Improvements Carol Lyons Awarded
4/3/2013 13-56 Cement David Collier Under Review
4/3/2013         13-50     Bardstown Road Main Replacement    Robin Heitz Awarded
4/3/2013 13-54 2013 Shoring Box Purchase     Terri Conner Awarded
4/3/2013 13-47 B.E. Payne Water Treatment Plant High Lift Building Area Improvements 12-Inch Yard Piping Terri Conner Awarded
3/20/2013 13-44 Powdered Activated Carbon for Ft. Knox Carol Lyons     Awarded
3/20/2013         13-32     LWC Grid-Ties (Blankenbaker Pkwy & Woodfern Lane to Labor Way) Robin Heitz Awarded
3/13/2013 13-30 Uniforms for Union Staff Robin Heitz Awarded
3/13/2013 13-26 Ormsby Lane Water Main Replacement Project Terri Conner Awarded
3/6/2013 13-25 St. Anthony Woods Court and Easement 1932 Water Main Replacement Project Terri Conner Awarded
3/6/2013 13-09 Aiken Road Main Replacement Project     Terri Conner Awarded
2/27/2013 13-11 Rolling Fields Water Main Replacement Project Terri Conner Awarded
2/20/2013 12-118 External Post-Tensioning Tendon Reapirs on Large Diameter PCCP Water Mains Carol Lyons Awarded
2/13/2013 13-12 16" & 20" Restraint Joint Clamps         David Collier Awarded
2/13/2013 13-13 I-265 Bridge (East End) Water Main Relocation Project Terri Conner Awarded
1/30/2013 12-106 Carbon Fiber-Reinforced Polymer Repairs on Large diameter Water Mains Carol Lyons Awarded
1/23/2013 13-02 Maintenance, Repair and Supplies for Konica / Minolta Multifunction Machines Carol Lyons Awarded
1/9/2013 13-06 Tapping Sleeves with MJ Outlets David Collier Awarded
1/9/2013 12-99 PVC Pipe David Collier Awarded
1/9/2013 12-148 Ductile Iron Pipe David Collier Awarded
1/9/2013 12-145 Restraint Joint Clamps David Collier Awarded
1/9/2013 12-205 Water Fill Stations Upgrade Project Robin Heitz Under Review
12/12/2012 12-151 Brass Valves and Fittings David Collier Under Review
12/12/2012 12-181 Drain Valves for BEPWTP Filters (Phase 1) Robin Heitz Awarded
11/28/2012 12-178 Bottle Blow Moulding Machine Terri Conner Reject all bids
11/14/2012 12-139 Fire Hydrants David Collier Under Review
11/14/2012 12-190 Major Engine and Transmission Repairs - Under One Ton Robin Heitz Awarded
11/14/2012    12-191 Major Engine and Transmission Repairs - One Ton and Over Robin Heitz Awarded
11/14/2012 12-78 Louisville Water Company Pumping Station #1 Restoration Tax Credit Terri Conner Awarded
11/7/2012 12-192 BE Payne Water Treatment Plant High Lift Building Area Improvements Terri Conner Reject all bids
10/24/2012 12-146 Ready Mix Concrete & Flowable Fill David Collier Under Review
10/24/2012 12-147 Valve Meter Box Maintenance     David Collier Under Review
10/24/2012 12-172 Bullitt County AMR Installation Project Carol Lyons Awarded
10/17/2012 12-179 Taylorsville Road - Chenoweth Run Road Project     Terri Conner Awarded
10/10/2012 12-176 Restoration Construction of Asphalt and Concrete Paved Surfaces David Collier Under Review
10/10/2012 12-144 Barricade Rentals David Collier Under Review
10/3/2012 12-177 Water Treatment Chemicals for Ft. Knox Carol Lyons Awarded
9/26/2012 12-171 Zorn Pump Station #1 Interior Restoration Terri Conner Awarded
9/26/2012 12-175 Taylorsville Master Meter #1 Renovation Terri Conner    Awarded
9/19/2012 12-156 Preston Highway 16" Transmission Main - Hwy 245 to Belmont Road    Terri Conner Awarded
9/19/2012 12-112 Electrical Switchgear Cleaning... Carol Lyons Under Review
9/12/2012     12-158 CISCO Maintenance Carol Lyons Awarded
9/12/2012 12-143 Rebar Anchors David Collier Under Review
9/12/2012 12-142 Casing Spacers David Collier Under Review
9/12/2012 12-150 Pipe Repair Couplings David Collier Under Review
9/12/2012 12-152 Outer Loop and Melda Drive Main Replacement Project Terri Conner Awarded
9/12/2012 12-153 LaGrange Road Main Replacement Project Terri Conner    Awarded
9/12/2012 12-115 Vehicle Body and Suspension Repair - Light Duty Robin Heitz Awarded
9/12/2012 12-114 Vehicle Body and Suspension Repair - Heavy Duty Robin Heitz Awarded
9/12/2012 12-113 Road and Tire Service Robin Heitz Awarded
9/12/2012 12-83 Wolf Pen Branch Phase II Transmission Main Carol Lyons Awarded
9/5/2012     12-108 North Buckman Street Main Replacement and Pressure Reducing Station Project Carol Lyons Awarded
9/5/2012 12-140 Pipe Repair Sleeves    David Collier Under Review
9/5/2012 12-138 Meter Setters David Collier Under Review
9/5/2012 12-137 Sale of Scrap Metal David Collier Under Review
8/29/2012 12-134 JLH Building New Boiler Robin Heitz Awarded
8/29/2012 12-132 2012 Cathodic Protection Installation Project Terri Conner Awarded
8/29/2012 12-133 NACE 3 Consultant Terri Conner Awarded
8/22/2012 12-135 Meter Plug Locks David Collier Under Review
8/22/2012 12-130 Taylorsville Road Main Replacement Project Terri Conner Awarded
8/22/2012 12-117 John L Huber Building Emergency Operations Center Terri Conner Awarded
8/8/2012 12-116 Water Treatment Chemicals Carol Lyons     Awarded
8/8/2012 12-98 Horizontal Directional Drilling    Terry Atwell Awarded
7/18/2012 12-62 Swing Check Valves David Collier Under Review
7/18/2012 12-85 New Services Carol Lyons     Awarded
7/11/2012    12-107 Shelbyville Road Main Replacement Project Terri Conner Awarded
7/11/2012 12-96
Corrected
Wireless Network Switch Replacements for Allmond Ave., and Crescent Hill Filter Plant (CHFP) Carol Lyons Awarded
7/11/2012 12-61 Barricades, Lights and Traffic Cones David Collier Under Review
7/11/2012 12-89 LWC Property Protection Services Carol Lyons Awarded
7/11/2012 12-104 Steel Casing Pipe David Collier Under Review
7/11/2012 12-102 Copper Tubing David Collier Under Review
6/27/2012    12-95 Millers Lane and Dixie Highway Water Main Replacement Project     Terri Conner Awarded
6/20/2012 12-94 Rose Island Road Water Main Extension Project Terry Atwell Awarded
6/20/2012 12-88 Truck Service Body Terri Conner Awarded
6/20/2012 12-87 Utility Service Body for 1 Ton Cab & Chassis Terri Conner Awarded
6/6/2012 12-34 Vehicle Wash Supplies     Carol Lyons     Awarded
6/6/2012 12-33 Heavy Equipment Rental Carol Lyons Awarded
6/6/2012 12-86 Crew Truck 33,000 GVWR Cab Chassis and Tandem Dump Truck 52,000 GVWR Cab Chassis Carol Lyons Awarded
5/30/2012 12-80 Elevator and Structural Slab Rehabilitation for Crescent Hill Zorn Pump Station Boiler Buildings Terry Atwell Awarded
5/30/2012 12-84 West Blue Lick Road Water Main Replacement Carol Lyons Awarded
5/23/2012 12-82 Poplar Level Road and Hess Lane Water Main Replacement Project Terri Conner Awarded
5/16/2012 12-52 Hydraulic, Machine and Gear Oils Terri Conner Awarded
5/16/2012 12-79 Reamers Road Water Main Replacement Program Terri Conner Awarded
5/2/2012 12-57 Ductile Iron Pipe Fittings With Accessories David Collier Under Review
5/2/2012 12-73 Southside Drive and Iroquois Avenue     Terry Atwell Under Review
5/2/2012 12-59 Aluminum Hatches David Collier Under Review
5/2/2012 12-58 Tapping Saddles David Collier Under Review
5/2/2012 12-54    Plastic Meter Vaults and Elevator Rings David Collier Under Review
4/25/2012 12-72 Philips Lane and Preston Highway Water Main Replacement Project Terri Conner Awarded
4/4/2012 12-47 De-chlorination Facilities at CHWTP & BEPWTP Carol Lyons Awarded
4/4/2012 12-68 Old Harrods Creek Road and Tucker Station Road Water Main Replacement Carol Lyons Awarded
3/28/2012 12-41 Oak Street Area Lead Service Renewals Terri Conner Awarded
3/28/2012 12-05 Cold Water Meters Terry Atwell Under Review
3/21/2012 12-40 Mary Street Area Lead Service Renewals Terry Atwell Awarded
3/21/2012 11-199 Distribution System Repairs & Capital Improvements Terry Atwell Awarded
2/29/2012 12-29 Overlook Acres Booster Pump Station Terry Atwell     Awarded
2/29/2012 12-08 Security Services Carol Lyons Awarded
2/29/2012 11-47 Transylvania Beach Sanitary Sewer Carol Lyons Awarded
2/24/2012 12-13 Westside Drive Main Replacement Project Terry Atwell Awarded
2/15/2012 12-12 Shelby Street Area Service Renewals Project Terry Atwell Awarded