Louisville Water Company Construction Projects That May Affect Your Commute
Posted 9/23/2009
Highway 1793 between Longwood Lane and Reading Road (Oldham County). Install 3,518 feet of water main.
North English Station Road between Data Vault Drive and Shelbyville Road. Install transmission main following the Gene Snyder Freeway from English Station Standpipe to Billtown Road.
Highway 44 between Highway 61 (Preston Highway) and Pitts Point Road. Install 12,000 feet of 12-inch water main.
Preston Highway (Highway 61) from Cardinal Drive to John Harper Highway. Install 8,300 feet 16-inch water main.
Preston Highway (Highway 61) from Mudd Lane to John Harper Highway and back east to (Highway 61) Preston Highway. Install approximately 15,500 feet of 24-inch water main.
Westport Road between Chenoweth Lane and Ridgeway Avenue. Install 3,305 feet of 8-inch and 12-inch water main.
37th Street between Broadway and Garland Avenue. Lead service renewal.
Carlton Terrace between Trevilian Way and Saratoga Drive. Lead service renewal.
River Road between 2nd Street and Fourth Street. Install 1,200 feet of 12-inch water main.
Third Street between Main Street and River Road. Install 1,000 feet of 12-inch water main.
Watterson Trail between Old Taylorsville Road and Bruner's Way. Install 380 fee of 8-inch water main.