Broad Run Road Bridge Replacement Project
Information pertaining to the Broad Run Road Bridge replacement project will be posted on this website. Click on the links below to view and/or download the available documents. All documents are in PDF format.
Short Project Description
Existing box beam bridge built in 1980 and located at Back Run Road, has slowly deteriorated over time from weather and age. Louisville Metro Public Works is working on replacing this structure with a precast concrete conspan bridge. Construction to being in Spring/Summer 2011.
Documents Available
Contact Us
Use this link to fill out an online form; your comments will be sent to the Project Manager.